- Implementation of Vacuum absorption chiller (Capacity 900 tons)
- Installation of 1 Mwp on grid solar PV system (1.88% of total energy)
- Replacement of existing 15 TPH capacity boiler with higher efficient ( boiler
- Replacement of existing Stenter machine with new 20% energy efficient machine
- Replace high efficiency new compressor system instead of old compressor system
- Replace all old steam line insulation by new insulation
- Install one new efficient EGB boiler instead of old EGB boiler
- Total GHG Saving: 9929.36 tons
Total estimated investment for FY 2024 : 3.28 MUSD
- Installation of 1.4 MWp on grid solar PV system (3.51% of total energy)
- Replacement of Low efficient machines by efficient ones
- Total GHG Saving: 1969.38 tons
- Total estimated Investment for FY 2025: 1.79 MUSD
- Installation 700 KW p of Solar PV system in all possible area (5.83%) of total energy)
- Replacement of Low efficient machines by efficient ones
- Total GHG Saving: 1421.44 tons
- Total estimated investment for FY 2026 : 1.49 MUSD