- Performance evaluation of recycled water, next extension.
- Plan for study for ZLD implementation.
- Total Investment for FY 2025: 0 USD
- Recycling of 720 m3/day water after ETP.
- Dedicated reused hot water line for wet processing machines.
- Process water consumption reduced by 20%
- Reuse of WTP blowdown water.
- Dedicated hot water line for production process.
- Reuse of all hot water in production process.
- Total Investment for FY 2024: 0.55 MUSD
- Implementation of ZLD
- Central monitoring system of water consumption.
- Total Investment for FY 2026: 0.83 MUSD